Sealing
Main Hull
Electrical Preparation
-
Check the wires on Fischer receptacles on the endcap. Make sure none have been torn loose.
-
Ensure all wires on MOAB or FOAB (whichever is being sealed in the robot) are constrained and will not get caught on anything
-
Check the Acoustics System.
Details
- Ensure that 4 single-channel boards are present.
- Ensure the hydrophone power switch is in the "ON" position
- Make sure the FPGA board's power switch is in the "ON" position
-
Double check electrical system wiring
Details
- Control board
- USB to jetson
- Depth sensor cable properly seated on connector
- PWM to ESCs all properly seated on connectors
- MEB
- USB from MEB to USB hub
- System switch wire connected
- Kill switch wire connected
- I2C cable to MSB present
- Battery power cable connected
- Leak sensor wires connected
- MSB
- I2C wire to MEB connected
2x Torpedo Wires connected (not currently used)- 2x Dropper Wires connected
- 5V regulator (UBEC) connected
- Jetson Nano
- Ethernet connected
Software kill wire on GPIO (not currently used)- USB hub connected
- Power connected to barrel jack
- Acoustics System
- UBEC connected to distribution board
- USB from FPGA to USB hub or jetson
- One hydrophone wire pair connected per single channel board (4 total)
- 4x Wires from each single channel board to FPGA dev board
- Control board
-
Insert MOAB or FOAB making sure it fully seats into the powerpole block connector. Make sure it is inserted in the correct orientation.
-
Connect all wires from MOAB/FOAB to the endcap
Details
- Ethernet (tether)
- 2x Camera USB to USB hub
- 4x Hydrophones
- Depth sensor
- Kill switch
- System switch
Torpedos (not currently used)- Droppers
- LED strip
-
Before sealing, dry run
Sealing
TODO
Pressure Test
TODO
Battery Hulls
Electrical Preparation
- Ensure battery is charged!
- Check fuse in fuse adapter to make sure it is not burned out
- Connect battery through endcap and make sure voltage is measured on end of fischer (use a loose receptacle to measure!)
- Make sure leak probes are in correct positions and attached to leak sensor in hull
Sealing
TODO
Pressure Test
TODO